NBS Source
I'm a manufacturer

This case study is no longer available.

Farringdon Crossrail Station

OVERVIEW

Sorba were delighted to secure the 150m station platform fit-out contract in 2016, where Sorba fully designed, tested and supplied/installed, there own GFRC cladding system taken from the concept design. Alot of design parameters and test requirements were over come, and we are now very proud of the final results.

No featured products in this case study

Contact Sorba UK Ltd by clicking the button below to find out which products were used in this case study.