NBS Source
I'm a manufacturer

This case study is no longer available.

Factory Coated Cladding

OVERVIEW

Millworks worked with Devlin Architects to deliver a mix of factory finished painted, fire protected and natural weathered Thermowood (Redwood) cladding. Thermowood was chosen due to the stability and ability to take a consistent painted finish, giving a longer service life. Vacuum coating gives the timber a consistent finish on all four sides. FRX Fire Treatment was pressure treated into the timber before painting to achieve a Euroclass B fire certificate. Summary: Grade. Sawfalling (sound tight knots) Width. 19x143mm Profile. MW-2 PEFC certified Fire Treated Factory coated

No featured products in this case study

Contact Millworks Ltd by clicking the button below to find out which products were used in this case study.