NBS Source
I'm a manufacturer

Facebook Data Centre Dublin

OVERVIEW

Specific service penetration deflection. High movement requirement due to construction type. Firestopping requirements through flexible walls and concrete floors up to 120 minutes with typical 2mm deflection required for all service penetrations.

No featured products in this case study

Contact FSi Limited by clicking the button below to find out which products were used in this case study.

More case studies from FSi Limited

View all case studies (11)
Dubai Airport

Dubai Airport

Media City Manchester

Media City Manchester

Dublin Waste Facility - Dublin

Dublin Waste Facility - Dublin

Project Verde SW1 - London

Project Verde SW1 - London