NBS Source
I'm a manufacturer

This case study is no longer available.

Essex University.

OVERVIEW

Mero provided type 5 access floors to main building several thousand meters installed, Ground floor entrance required a seamless transition from the Granite walkways outside to inside, this meant we provided 600m2 of our type 6 calcium sulphate panel factory applied with an Italian Granite.

No featured products in this case study

Contact Mero-Schmidlin (UK) plc by clicking the button below to find out which products were used in this case study.