NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

OVERVIEW

The Greatham Managed Realignment Scheme was part of the Environment Agencies wider " Tees tidal Flood Risk Management Strategy" which imposed a legal requirement upon the Environment Agency to deliver intertidal habitats as compensation for the impact of flood management projects. The challenge was to construct embankments comprising predominantly of site won material. THe size, scale and nature of the works dictates a tight time scale was maintained to ensure rapid return to its natural state. ABGs Erosamat Type 3 was chose, comprising 3 dimensional structure and entangled filaments. Erosamat forms a permanent composite with the natural vegetative root structure supported.

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK