NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Education | York High School

OVERVIEW

“If you ask pupils what aspect of the facilities is their top priority for the school to improve, it will always be the toilets. We now have a space that is bright, colourful and looks smart. These facilities are great!” - Ian Parnaby, School Business Leader. The washroom area was a unisex block, which meant that privacy was a key priority when selecting their cubicle range. They also had to be smart, robust and easy to clean and maintain. With all this in mind York High School selected full height Centurion cubicles and Venesta’s pre-plumbed panelling system, Vepps®.

Products featured in this case study

View all products (59)
V2 | Centurion Full Height - Toilet Cubicles

V2 | Centurion Full Height - Toilet Cubicles

Panelling | Vepps HPL Square Edged, IPS - IPS system

Panelling | Vepps HPL Square Edged, IPS - IPS system

More case studies from Venesta Washroom Systems Ltd

View all case studies (33)
Education | Royal Grammar School

Education | Royal Grammar School

Education | Magdalen College School

Education | Magdalen College School

Education | Isaac Newton Academy

Education | Isaac Newton Academy

Education | Belleville Primary School

Education | Belleville Primary School

More case studies from Panel cubicle systems

View all case studies (37)
Concierge Camping

Concierge Camping

Honiton Swimming Pool

Honiton Swimming Pool

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

More case studies from Pre-plumbed installation frames

View all case studies (5)
Education | Tudor Grange Academy

Education | Tudor Grange Academy

Wirquin and Crimple Hall

Wirquin and Crimple Hall

Wirquin and Holiday Inn Corby

Wirquin and Holiday Inn Corby

Wirquin & Delamere Health Ltd

Wirquin & Delamere Health Ltd