NBS Source
I'm a manufacturer

Education | Royal Grammar School

OVERVIEW

“The Venesta cubicles offer easy maintenance and cleaning. The product has really improved since the original product twenty years ago and there are some lovely colour schemes to choose from.” - Christina Roper, Boarding Administrator. Having previously installed Venesta cubicles in the late 90s, the school decided it was time for a total refurbishment of the washroom areas, and Vanesta was the natural choice for this new project. Needing something that was easy to clean and maintain, built to last and simple to install, Award cubicles in High Pressure Laminate (HPL) were chosen with matching Solid Grade Laminate vanity units.

Products featured in this case study

View all products (59)
Panelling | Vepps - 100 mm Baserail, IPS - IPS system

Panelling | Vepps - 100 mm Baserail, IPS - IPS system

More case studies from Venesta Washroom Systems Ltd

View all case studies (33)
Education | Magdalen College School

Education | Magdalen College School

Education | Isaac Newton Academy

Education | Isaac Newton Academy

Education | Belleville Primary School

Education | Belleville Primary School

Education | The Leigh Academy

Education | The Leigh Academy

More case studies from Pre-plumbed installation frames

View all case studies (5)
Education | Tudor Grange Academy

Education | Tudor Grange Academy

Wirquin and Crimple Hall

Wirquin and Crimple Hall

Wirquin and Holiday Inn Corby

Wirquin and Holiday Inn Corby

Wirquin & Delamere Health Ltd

Wirquin & Delamere Health Ltd