The Merker site in Baden now houses 45 low-cost apartments where the enameling plant once stood. The five-story structure sets new standards with regard to insulation and energy consumption. Architects Zulauf & Schmidlin have designed 45 apartments as the second stage of converting the site of the former Merker factory in Baden. The owners wanted an energy-efficient building and apartments with different layouts – suitable for singles and families. The folding sliding shutters made of lasered, perforated metal plate are equipped with the HAWA Frontfold 20 hardware.The shutters are powered by the building's electric system.
Contact Hawa Sliding Solutions AG by clicking the button below to find out which products were used in this case study.
New life for an old Bergelle house Casa Sott Pare 31
Chalet Chantemerle
Hotel Hyatt, Abu Dhabi
Health resort & spa hotel Rosenalp