OVERVIEW
Burrow Court is an occupied residential block comprising 22 -storeys at its highest point that was previous clad in combustible ACM cladding. The replacement specification was High Density Mineral wool Insulation for Rendering System (ETHIC) fixed by Long Insulations Screws, with plastic and Stainless steel washers Wimpy Concrete New Fine Substrate.
Pull Out Test carried out to ensure sustainable installation for the Tall Buildings wind effect.
Pre painted Alum Coping 2mm Thickness fixed with rivet and caps, fixing straps prior to coping every 400mm.
Silicone Mastics on all joints.
Pre Painted window sills provided for all windows .
Contact Building Insulation Solutions (BIS) by clicking the button below to find out which products were used in this case study.