NBS Source
I'm a manufacturer

This case study is no longer available.

Dundee and Angus College

OVERVIEW

At Dundee and Angus College, a new 500m2 roofing system was required as part of the refurbishment of an existing sports hall roof. With an eight-week shutdown period, BriggsAmasco specified the Mach One insulated system due to its excellent thermal properties and ability to meet the tight deadline. The company supplied and installed the complete overlay solution comprising Mach One insulated system, new access ladder, and permanent edge protection. Comprising a polyester glass-fibre composite reinforcement with exceptional mechanical strength and stability, the Mach One single layer roofing system can be mechanically fastened, ballasted or bonded with polyurethane adhesive.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.