NBS Source
I'm a manufacturer

Dublin Airport

OVERVIEW

SAS International designed and manufactured a range of solutions for the new 75,000 square metres Terminal 2 at Dublin Airport, Ireland. According to Dublin Airport the new second terminal will be capable of comfortably handling up to 15 million passengers per year. Specification demanded that durability, ease of maintenance and acoustics were considered. SAS International worked with architects Pascall + Watson to design the ceiling solution answering the architect’s brief to factor in ongoing maintenance conducted by Facilities Management teams in the future. The design of these large sized ceiling panels required careful consideration at design stage to ensure they would be manageable when working at a height. Designed and developed specifically for Dublin Airport was 35,000 square metres of ceiling systems, installed in the main departure area, walkways and baggage handling areas. This solution looks like any other suspended metal ceiling system as it provides an aesthetically pleasing flush finish. But where this product differs is its ingenious way of allowing access to the ceiling void and services for ongoing essential maintenance. This is of particular benefit in high traffic areas such as Dublin airport as it enables a corridor to remain in use rather than having to close off the entire route. SAS International manufactured the 20,000m2 of large aluminium frames for the fabric ceilings which creates a striking central feature. Working closely with SAS International were local installers Platt and Reilly who applied the stretched fabric to the frames on-site and hoisted them into position. Creating a comfortable environment for traveller and worker was helped with the use of acoustic floating rafts and perforated metal ceiling solutions (with integrated acoustic pads) to provide the necessary acoustic control for this project. Lighting was suspended neatly between the rafts to also provide a modern finish to the corridors. In addition Perimeter heating and air handling grilles also enhance the experience.

No featured products in this case study

Contact SAS International Australia by clicking the button below to find out which products were used in this case study.

More case studies from SAS International Australia

View all case studies (19)
University of Technology, Sydney

University of Technology, Sydney

Miesian Plaza, Dublin

Miesian Plaza, Dublin

University of Birmingham Library

University of Birmingham Library

Ropemaker Place, London

Ropemaker Place, London