NBS Source
I'm a manufacturer

Dry Installs Case Study, Manhattan Loft Project, London

OVERVIEW

In Manhattan Loft gardens, they have a dry install system and are going to use the recommended system from Sika, then fit the floor fully bonded with our SW890 adhesive. Installation and site visits are part of our service. With large residential tower developments, there will normally be slabs for each floor. These will take at least two years to dry out completely. This means that unless the slabs have a DPM applied there will always be a chance of moisture affecting whatever is laid on the floor be it a cradle system or dry install underfloor heating system.

No featured products in this case study

Contact The Solid Wood Flooring Company by clicking the button below to find out which products were used in this case study.

More case studies from The Solid Wood Flooring Company

View all case studies (29)
Walnut in the 2012 BBC Olympics Studio

Walnut in the 2012 BBC Olympics Studio

White Lacquered Oak in Roman House, London

White Lacquered Oak in Roman House, London

Percy & Founders Restaurant

Percy & Founders Restaurant

Using Specialist Wood Finishing Products to create a Unique Wood Floor

Using Specialist Wood Finishing Products to create a Unique Wood Floor