Dry Installs Case Study, Manhattan Loft Project, London

by The Solid Wood Flooring Company

  Favourite

In Manhattan Loft gardens, they have a dry install system and are going to use the recommended system from Sika, then fit the floor fully bonded with our SW890 adhesive. Installation and site visits are part of our service. With large residential tower developments, there will normally be slabs for each floor. These will take at least two years to dry out completely. This means that unless the slabs have a DPM applied there will always be a chance of moisture affecting whatever is laid on the floor be it a cradle system or dry install underfloor heating system.

Read more

No featured products in this case study

Contact The Solid Wood Flooring Company by clicking the button below to find out which products were used in this case study.