NBS Source
I'm a manufacturer

This case study is no longer available.

Distinct Double-Curved Roof for the Velodrome

OVERVIEW

Olympic Velodrome, London, which features a distinct double-curved roof. The 6,000 seat stadium incorporated 13,000 sqm of Kalzip Standing Seam roof, eight 100m long roof lights, 420lm of bullnose to the perimeter and 22 movement joints. The Velodrome is the most sustainable venue on the Olympic Park in terms of design and construction. Meeting the architect’s vision to create a bullnose perimeter that flowed and wrapped over the roof , a support system was designed to enable the ‘build’ tolerances to be overcome in all directions avoiding having visible fixings ensured the smooth, curved appearance was maximised

No featured products in this case study

Contact Bailey - Total Building Envelope by clicking the button below to find out which products were used in this case study.

More case studies from Bailey - Total Building Envelope

View all case studies (1)
Elwick Place

Elwick Place