Continuing BriggsAmasco’s increasing Public Health portfolio here we see an inverted holt melt roof, insulation and ballast with slab walkways to the perimeters on the prestigous Derby City Hospital project carried out for Skanska. The Hot Melt area was approximately 7550m2.
The project also included 5500m2 of Kalzip standing seam and 2000m2 of Sarnafil single ply roofing.
No featured products in this case study
Contact Briggs Amasco Ltd by clicking the button below to find out which
products were used in this case study.