Cutting Drainage & Reinforcement, Erosaweb & Fildrain, Luton Dunstable Busway, Bedfordshire, UK

OVERVIEW

Luton Dunstable Busway is a new construction connecting two Bedfordshire towns. The Busway comprises of twin tracks 6m wide allowing two directional travel. The guide way has a low noise surface and needed to minimise the impact on neighbouring properties. During the build it was necessary to steepen the slopes along both sides whilst maintaining their green finish. A solution for drainage was also required to remove the need for excavated stone. ABG proposed Erosaweb which can contain top soil in their three dimensional structure. ABGs Fildrain provided the drainage capacity at a fraction of the depth of stone.

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK