This case study is no longer available
Upnor Castle and its associated buildings recently underwent a scheme of repair and stabilisation work for which a custom blend of imperial Oxford Yellow Multi Waterstruck bricks with a bespoke weathered finish were selected to replace damaged bricks. The new brickwork blends in sympathetically with existing structures to preserve the character of this significant Scheduled Ancient Monument.
Contact Imperial Bricks by clicking the button below to find out which products were used in this case study.