CS_Proteus Pro-Felt_CO-OP Wembley

OVERVIEW

The existing felt waterproofing and timber deck had failed allowing water ingress into the residential building below. Upon further inspection, Proteus established that the existing roof lacked any insulation and therefore did not meet current Building Regulations.

No featured products in this case study

Contact Proteus Waterproofing by clicking the button below to find out which products were used in this case study.

More case studies from Proteus Waterproofing

View all case studies (12)
Case Study - Proteus Pro-Felt® - CO-OP Wembley

Case Study - Proteus Pro-Felt® - CO-OP Wembley

Case Study - Proteus Pro-Felt® - Hilton Hotel, Cobham

Case Study - Proteus Pro-Felt® - Hilton Hotel, Cobham

Case Study - Proteus Pro-Cold® - BMI The Blackheath Hospital

Case Study - Proteus Pro-Cold® - BMI The Blackheath Hospital

Case Study - Proteus Pro-BW® Plus - Knolly's House

Case Study - Proteus Pro-BW® Plus - Knolly's House