Vinci selected Mero to provide the raised flooring for the control rooms, LV/HV Electrical rooms, this was a massive Civils project with our floor being 30m up in the structure, very challenging site conditions with most of the subfloor being covered with armoured cable and raceways.
Contact Mero-Schmidlin (UK) plc by clicking the button below to find out which products were used in this case study.
Newhaven ERF-Control rooms
High rise Residential
Data Centre-Crawley
Data Centre-Chessington.