As part of the refit, the building required a new roof as it was showing signs of wear and had started to leak. As well as a waterproofing solution, the client wanted to improve the thermal performance in line with current building regulations. For health and safety reasons, the client also requested a flame free roofing solution.
No featured products in this case study
Contact IKO PLC by clicking the button below to find out which
products were used in this case study.