NBS Source
I'm a manufacturer

This case study is no longer available.

City Lofts

OVERVIEW

The specification was a three layer system laid over cut to falls insulation. The roofing part of the project was complex because the system was laid over a large number of different levels and had to be integrated with other elements of the build.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.