This case study is no longer available —
Initial Situation: Heavy staining in first floor bedroom. The cause of the condensate was the flue from the oil boiler situated in the cellar. Project Challenge: Access to the chimney was not easily possible. Turner Baker Ltd arranged the hire and delivery of an access platform. As the existing stainless steel liner had failed the client requested a more durable solution as a replacement. Liner Chosen: FuranFlex25 Black Result: A FuranFlex25 Black liner was recommended, which carries a 25 year guarantee. The original stainless steel liner was removed. The FuranFlex liner was then cured and the existing boiler reconnected.
Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.