The Central Birmingham Symphony Orchestra wanted to revamp their staging. The orchestra wanted height adjustable staging that can be used in a range of different formats. The staging was to be used by the orchestra as well as tiered audience seating. The orchestra chose CPS's Alu Combi system which is a height adjustable, modular system with a waterproof and anti-slip surface. Handrails and storage trolleys were also provided.
Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.
Alexandra Palace Theatre Restoration Seating, Orchestra Pit and Staging
Villa Cross Church of God Prophecy Auditorium Seating
Exeter Cathedral Staging
2012 Olympic Games Media Centre Auditorium Seating and Staging