Castle Court in Sheffield was originally constructed in 1962 by Sheffield City Council. Comprising of three-hundred
and three apartments in a single apartment block, this project was a massive investment for the area at the time.
NorDan alu-clad StormGuard windows had been selected as part of the regeneration works in 1991 and to this very day, the windows are still in excellent working condition – there has not been a single call back on any of the products installed. This is a true testament to the fact that NorDan windows are, and always have been, exceptionally high performing.
No featured products in this case study
Contact NorDan UK Ltd by clicking the button below to find out which
products were used in this case study.