Following the install of generators and compressors at the Data Centre. There was a requirement for noise control when the generators and compressors were commissioned. The acoustic barrier consisted of universal beam posts at 3.00m centres, absorptive recycled plastic boards, with a fibre glass infill to reduce the noise of the plant contained behind the barrier. A mid rail galvanised box section has been position to provide additional strength to the acoustic panel. Access Gates were also pr…
Show moreContact Procter Contracts by clicking the button below to find out which products were used in this case study.