NBS Source

Cardiff Castle - F. Ball products create unassailable flooring finish at Cardiff Castle

by Ball, F and Co Ltd

F. Ball products have been used in a resilient flooring installation capable of withstanding high temperatures as part of the refurbishment of Cardiff Castle visitor centre. Firstly, old carpet and ceramic tiles had to be uplifted. Contractors then mechanically prepared the subfloor. Next, Stopgap P131 general-purpose primer was applied to the subfloor, enabling promotion of the application characteristics and stop the unacceptably rapid drying of subsequently applied levelling compounds, in addition to preventing pinholing. Stopgap 1200 Pro levelling compound was then applied over the entire subfloor to create a perfectly smooth base for the receipt of new floorcoverings.

No featured products in this case study

Contact Ball, F and Co Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Ball, F and Co Ltd

View all case studies(44)
Birmingham City Hospital - Ante-natal clinic gets the right treatment with Styccobond F44

Birmingham City Hospital - Ante-natal clinic gets the right treatment with Styccobond F44

Christ Church Primary School - School hall fit for playtime thanks to F Ball

Christ Church Primary School - School hall fit for playtime thanks to F Ball

Christ Church School, Frome - F Ball provides adhesives masterclass at Frome school

Christ Church School, Frome - F Ball provides adhesives masterclass at Frome school

Eden Court Theatre - F. Ball products star in Eden Court theatre production

Eden Court Theatre - F. Ball products star in Eden Court theatre production