In 2013 IKO PLC were asked to investigate issues at the Four Square Estate, Southwark, in respect of the existing access walkways that were surfaced with Mastic Asphalt, by Keepmoat and Southwark Council. It was agreed that the Mastic Asphalt required replacing, along with screed repairs and new expansion joints. Work commenced in 2014 by Superior Roofing & Building Services Ltd and was completion by 2016. During the works some 1,400 tonne of IKO Permaphalt was installed along with IKO Permascreed. A 20 year guarantee was provided giving peace of mind and long term security for the sustainability of the system.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.