NBS Source
I'm a manufacturer

Bulk Storage Facility

OVERVIEW

The technical team at Lochrin Bain were approached by an existing client looking to secure a new bulk storage centre located outwith their current secure facility. The global Defence, Aerospace and Security company having worked with Lochrin Bain on previous retro-fit and new build projects, instructed the design house and main contractor Wates Construction of their approved specification with the clients Security Manager opting for Lochrin Bain’s patented High Security Combi™ fencing over a traditional Palisade or Mesh alternatives.

No featured products in this case study

Contact Lochrin Bain Limited by clicking the button below to find out which products were used in this case study.

More case studies from Lochrin Bain Limited

View all case studies (6)
Regeneration Site: Waterfront Business Park

Regeneration Site: Waterfront Business Park

Utility Site Security Upgrade

Utility Site Security Upgrade

Flood Defence Scheme

Flood Defence Scheme

Distribution HQ: Combi Palisade SL1

Distribution HQ: Combi Palisade SL1