Building Isolation - Bridgewater Hall Concert Hall

by Total Vibration Solutions Limited t/a TVS Group

The Bridgewater Hall in Manchester is a 2400 seat concert hall constructed in close proximity to the cities Metrolink tramway. Ground-borne vibration caused by passing trams was highlighted by Arup as going to cause unwanted structural noise within the performance space. To avoid this the building was constructed off 280 number GERB pre-stressable coil spring bearing assemblies positioned on the concrete column heads and tuned with a vertical natural frequency of 3.5Hz.

No featured products in this case study

Contact Total Vibration Solutions Limited t/a TVS Group by clicking the button below to find out which products were used in this case study.

More case studies from Total Vibration Solutions Limited t/a TVS Group

View all case studies(6)
TVS ABSorb Baffles - 3 Hardman Street Manchester

TVS ABSorb Baffles - 3 Hardman Street Manchester

Blaze Studio Birmingham - RESi Dry Floating Floor

Blaze Studio Birmingham - RESi Dry Floating Floor

Rochdale Riverside Cinema - Acoustic Floating Floors

Rochdale Riverside Cinema - Acoustic Floating Floors

Owen Street, Manchester - RESi Dry Floating Floor

Owen Street, Manchester - RESi Dry Floating Floor