NBS Source
I'm a manufacturer

This case study is no longer available.

Building for the future of education

OVERVIEW

Jade Windows has completed a large project at Castleford Academy which saw the establishment self-fund a two phase refurbishment of windows, doors and a fully glazed corridor. With over 1200 students attending Castleford Academy the need for refurbishment was apparent as Ryan Fozzard, estimating manager at Jade Windows explained: “For students to perform well academically their environment needs to be comfortable and inspiring. The original school was built in 1906 and despite the addition of a sports hall and drama studio, the building had become tired and desperately needed an overhaul.”

No featured products in this case study

Contact Spectus Window Systems by clicking the button below to find out which products were used in this case study.