NBS Source
I'm a manufacturer

British Museum WCEC

OVERVIEW

For the basement laboratories, Planet used p100 demountable double-glazed full-height partitions with two layers of 15mm toughened glass to reach heights in excess of three metres. The partitioning framework was set within the steel grid structure, ensuring an industrial look and incorporating slimline single-glazed and SonoTec double glazed doors with integrated venetian blinds. Planet provided a full blackout option for lab work on sensitive ancient human remains. Planet AG was responsible for the full-height atrium glazing, using 19.5mm toughened laminated glass. It required carefully spaced holes for securing attenuators that control airflow within the building.

Products featured in this case study

View all products (54)
PURE100 Double Glazed Panel Partition System

PURE100 Double Glazed Panel Partition System

More case studies from Planet

View all case studies (57)
Ampersand, London

Ampersand, London

Santander UK HQ in London

Santander UK HQ in London

Network Rail HQ, Milton Keynes

Network Rail HQ, Milton Keynes

Equinox Gyms, London

Equinox Gyms, London

More case studies from Partition panels

View all case studies (50)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca