One of the impressive venues for the 2014 Winter Olympics in the Russian city of Sochi.
Construction time/completion of the project:
2012.
Area:
12,000 seats.
Area of construction: 18 534 m².
Total area of the building: 54 870 m².
Client:
SC Olympstroy.
Architects:
MC Mostovik Architects.
Construction engineer:
Andrey Ustinov, Andrey Veter.
Products:
O.novo Toilets.
O.novo Washbasins.
Subway Urinal.
Subway Washbasins.
Omnia architectura Toilets.
No featured products in this case study
Contact Villeroy & Boch AG by clicking the button below to find out which
products were used in this case study.