NBS Source
List your products

Barratt Code Level 6 Homes Feature Posi-Joist

by MiTek Industries Ltd

  Favourite

The first homes at Barratt Homes’ new energy efficient Hanham Hall development feature Posi-Joists as the floor system of choice. Each home is constructed using highly insulated materials and is fitted with a Mechanical Ventilation with Heat Recovery (MVHR) system, which is why Posi-Joist was the natural choice for the floor system. Kingspan Potton have been involved throughout the design and delivery of the project, supplying both Structural Insulated Panels and the Posi-Joist floors.

Read more

No featured products in this case study

Contact MiTek Industries Ltd by clicking the button below to find out which products were used in this case study.

More case studies from MiTek Industries Ltd

View all case studies from MiTek Industries Ltd (3)