NBS Source
I'm a manufacturer

This case study is no longer available.

Barclays, Churchill Place, Canary Wharf

OVERVIEW

As part of a continuing rollout of Propelair technology across the Barclays portfolio, 27 toilets have been installed following the success of a 19-day trial at the Barclaycard Call Centre premises in Kirkby, a high occupancy site. As well as significant improvements in resource efficiency, Propelair is one of the most hygienic toilets available and its design is a significant step change compared to conventional toilets, with better performance, quicker flush and a simple maintenance process, making it the suitable choice for the demands of this high usage site.

No featured products in this case study

Contact Propelair by clicking the button below to find out which products were used in this case study.