The client required a large shop floor leveling on a tight time frame. The 6000m2 floor ranged from 18-35mm in depth, with a tight time frame. Gyvlon Excelio bonded at 18-35mm was the chosen product due to the speed, strength and cost savings. The large floor was poured over 3 days with trades being able to light foot traffic within 24 hrs and full site traffic within 48 hrs ensuring the tight frame was achieved. By using Ready mix Gyvlon Excelio the customer saved time and money by replacing a bagged self leveler with Gyvlon Excelio.