NBS Source
I'm a manufacturer

This case study is no longer available.

Bamburgh Clinic

OVERVIEW

The deck on this project consisted of a prefabricated ready insulated timber casette structure which was craned into position, a breather membrane was then fitted followed by the standing seam system. Finally an especially large capacity external gutter system was designed and fitted.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.