NBS Source
List your products

Bamburgh Clinic

by Briggs Amasco Ltd

  Favourite

The deck on this project consisted of a prefabricated ready insulated timber casette structure which was craned into position, a breather membrane was then fitted followed by the standing seam system. Finally an especially large capacity external gutter system was designed and fitted.

Read more

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Briggs Amasco Ltd

View all case studies from Briggs Amasco Ltd (87)