by Zentia
A new 53,280ft campus was being built to enable three schools to co-locate. An Additional Support Needs (ASN) unit and a new Early Learning and Childcare Centre (ELCC) would also operate at the site. In total there would be 21 open-plan flexible learning spaces for the potential 747 students, as well as a centrally-located shared administrative areas, gym halls and assembly area, while the ASN has capacity to assist 36 pupils with a varying range of support needs.
Contact Zentia by clicking the button below to find out which products were used in this case study.
Wirral Waters