NBS Source
I'm a manufacturer

This case study is no longer available.

Asphalt Reinforcement - A87 Trunk Road, Rotaflex, Isle of Skye, Scotland

OVERVIEW

The 99 mile long A87 is a major trunk road in the Scottish Highlands with an average daily vehicle movement of 2200. Due to the high exposure of the Road and deep foundations of peat the road is susceptible to flexural cracking. A solution was required to the differential movement and flexing of the carriageway. ABG Rotaflex 830 asphalt reinforcement geocomposite was selected due to its high strength/low strain glass fibre grid. Applied over Bitumen the Rotaflex bonded and set hard under asphalt. Once applied Rotaflex provided an effective,efficient low maintenance solution

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK