NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Asphalt from 1906 Replaced on Major UK Landmark

OVERVIEW

Successful project management and asphalt installation (in accordance with BS 8218:1998) were key to conserving one of the most important architectural structures in the UK. Works were phased to enable continued public access to Stone Gallery sections. The height and highly sensitive fabric of the building meant that all materials were transported to the Gallery via three hoists, requiring careful operation and management. Asphalt was stripped and re-laid in sections to ensure watertightness. Stripping enabled the client to view the condition of the Portland Stone paving beneath the asphalt.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies (88)
Essential Roofing Works Carried Out For Sewage Treatment Works

Essential Roofing Works Carried Out For Sewage Treatment Works

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment