NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

ARDEX Completes Another ‘Historic’ Project

OVERVIEW

The British Museum opened its doors in 1759. Now home to some 8 million works from a number of different cultures, the museum stands as an iconic London attraction. The Museum made the decision in November 2013 to replace the restaurant’s old flooring, as it could no longer handle the vast number of visitors. W B Simpson Ltd, was the chosen tiling contractor to complete the new installation. Marc Poland, Director at W B Simpson Ltd said “The architect consulting on this project specified we use ARDEX UK’s products. Their high performance adhesives are typically the preferred choice of architects.”

No featured products in this case study

Contact Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products by clicking the button below to find out which products were used in this case study.

More case studies from Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

View all case studies (50)
British Museum - London

British Museum - London

Victoria and Albert Museum - London

Victoria and Albert Museum - London

North Manchester General Hospital

North Manchester General Hospital

Burj Khalifa - Dubai

Burj Khalifa - Dubai