NBS Source
I'm a manufacturer

This case study is no longer available.

Apartment Scheme for Barratt Homes, London

OVERVIEW

This project consisted of a 26 story block of apartments which all required a resilient acoustic membrane and a screed which could be guaranteed to achieve a minimum of 80kg/m2. This was in order to ensure that the scheme met the relevant building regulations with regard to sound transmission. The screed also needed to be manufactured off site and be delivered and installed so as to cause as little disruption to the surrounding environment as possible. Gypsol Summit exhibits the right density and can also be pumped to high level using a single pump saving cost and time

No featured products in this case study

Contact LKAB Minerals by clicking the button below to find out which products were used in this case study.

More case studies from LKAB Minerals

View all case studies (6)
Vistry Partnerships select Gypsol on one of their largest regeneration sites in London

Vistry Partnerships select Gypsol on one of their largest regeneration sites in London

Short lead times with Gypsol Complete

Short lead times with Gypsol Complete

Gypsol screeds launched in Australia

Gypsol screeds launched in Australia

New home installed with Gypsol HTC

New home installed with Gypsol HTC