Adelaide Botanic High School, SA

OVERVIEW

The initial project had been executed in August 2017. Customising the building with KEY-LOCK Suspended Ceiling System, particularly Rondo 155 Furring Chanel which is 48mm wide, and required perforated plasterboard to be attached. Bulkheads, soffit areas and external walls were designed by the Rondo Engineering team.