Following fire damage to the existing
timber fencing, Procter Contracts were
tasked with replacing the damaged timber. Due to the timber fencing being
7.00m high, there was an issue with “working at height”, also working in a
residential car park. Our trained operatives were working of a mobile
platform to secure the boards as required. With due care to ensure no damage was caused to other vehicles in the car park.
No featured products in this case study
Contact Procter Contracts by clicking the button below to find out which
products were used in this case study.