NBS Source
I'm a manufacturer

This case study is no longer available.

Aberdeen Airport

OVERVIEW

Faced with a failing roof, the main terminal at Aberdeen International Airport required a fast, high performance and long term solution. BriggsAmasco fitted the bill perfectly with the specification and application of a comprehensive Sarnafil roofing system. With the main roofs totaling 4000m2 to overlay, a Sarnafil roof management system – renowned for high quality, long term performance – proved ideal. To cause as little disruption as possible and with minimal impact to the busy airport’s operations, BriggsAmasco completed some of the works in the early hours when aircraft movements are at a minimum.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.