NBS Source
I'm a manufacturer

This case study is no longer available.

Aberdeen Airport

OVERVIEW

BriggsAmasco delivered a watertight multi-roof system for the first phase of a £20 million redevelopment of Aberdeen Airport. Appointed by contractors, Balfour Beatty, initial works involved the construction of a two-storey extension to the south of the existing terminal building. At ground level, the extension will accommodate facilities for international arrivals as well as domestic baggage reclaim. Plus two business lounges will be located on the upper level. BriggsAmasco supplied a full design and installation package for the airport project...

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.