by IKO PLC
IKO Polimar FCS is a high performance cold applied, two part, fast curing waterproofing system was a perfect solution for this project as it cured within 20 minutes. Also, being a self-levelling and slip resistant product, it enabled residents to come and go within minutes of it being applied.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station