Due to its period architecture style and prominent corner location there were a number of design challenges to be overcome in order to attain full air conditioned office status for speculative open plan offices, for example, the building featured unique structural elements around the columns in addition to the floorplate configuration. In particularly shallow areas where the floor void was less than 200mm, the latest TUS-EC slimline Fantile units were installed allowing a minimum floor to ceiling height of 2.6 m to be maintained on all five office floors.
Contact AET Flexible Space by clicking the button below to find out which products were used in this case study.
180 Great Portland Street, London
Battersea Studios 2, London
Manchester Civil Justice Centre
One Cavendish Place, London