NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

180 Tonnes of IKO Permaphalt used in the Regeneration of Folkestone Seafront

OVERVIEW

The harbour arm was built in 1897 for the South Eastern Railway Company to connect trains with ships, originally for tourism but absolutely invaluable in the Great War, when men, horses and supplies left from here. Needing refurbishment as part of the overall major regeneration of Folkestone, the harbour arm’s mastic asphalt covering to the upper and lower levels was completely replaced over a period of three years in a series of packages for the Folkestone Harbour Company and their contractors using IKO Permaphalt and Recreational Duty Grade Mastic Asphalt.

Products featured in this case study

View all products (44)
Mastic Asphalt Roofing - IKO Permaphalt - Mastic asphalt roofing

Mastic Asphalt Roofing - IKO Permaphalt - Mastic asphalt roofing

More case studies from IKO PLC

View all case studies (88)
Essential Roofing Works Carried Out For Sewage Treatment Works

Essential Roofing Works Carried Out For Sewage Treatment Works

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment