NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Odeon Cinema

OVERVIEW

350m2 of the entrance foyer and retail area was levelled and smoothed over 3  nights, allowing the cinema to remain fully operational.

Products featured in this case study

View all products (92)
ARDEX P 4 Ready Mixed Multi Purpose Primer

ARDEX P 4 Ready Mixed Multi Purpose Primer

ARDEX K 39 High Flow Levelling Compound

ARDEX K 39 High Flow Levelling Compound

More case studies from Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

View all case studies (50)
British Museum - London

British Museum - London

Victoria and Albert Museum - London

Victoria and Albert Museum - London

North Manchester General Hospital

North Manchester General Hospital

Burj Khalifa - Dubai

Burj Khalifa - Dubai

More case studies from Smoothing and levelling underlay compounds

View all case studies (30)
UltraFloor makes homeowners dream come true

UltraFloor makes homeowners dream come true

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor set up home at prestigious housing development

UltraFloor set up home at prestigious housing development

Houses of Parliament - London

Houses of Parliament - London

More case studies from Primer-sealers

View all case studies (8)
Midfield Concourse Hong Kong International Airport

Midfield Concourse Hong Kong International Airport

Odeon Cinema

Odeon Cinema

McDonald's Tiling Refit for UK Restaurants

McDonald's Tiling Refit for UK Restaurants

RANSOMES DOCK APARTMENTS - LONDON

RANSOMES DOCK APARTMENTS - LONDON